Step one: Remove two layers of wall paper on walls.
Step Two: Remove toilets, mirrors, towel racks and various other items covering up wall paper.
Step Three: Removing more wall paper and cleaning up from steps two and three.(Wall paper removing it extremely messy!)
Step Four: Planning for and purchasing paint. (A lot harder than it sounds.)
Step Four: Prepping every thing for paint.. (Primer, Sanding, Removing more stuff.)
Step Five: Putting the first coat of paint on doors, drawers, cabinets, ceilings and walls.
Step Six: Putting the second coat on doors, drawers, cabinets, ceilings, and walls.
Step Seven: Putting the third coat on the things that needed it.
Step Eight: Buying new hinges, door knobs and handles and towel racks.
Step Nine: Putting new equipment on doors, attaching drawers and towel racks, then inserting drawers.
Step Ten: FINISHED!